| Reliability Based Maintenance | Ir. Deddy Nugraha, CMRP and Team | 4/1/2026 | 4/3/2026 | 3 | Bandung | 9,500,000 | April |
| SCADA (Supervisory Control & Data Acquisition) Operation & Maintenance | Prof. Endra Joelianto, Ir., Ph.D., SMIEEE | 4/4/2026 | 4/6/2026 | 3 | Bandung | 7,950,000 | April |
| Remaining Life Assessment (RLA) | Ir. Deddy Nugraha, CMRP and Team | 4/6/2026 | 4/8/2026 | 3 | Bandung | 9,500,000 | April |
| Downhole & Surface Production Equipment | Prof. Dr.-Ing. Bonar Tua Halomoan Marbun | 4/7/2026 | 4/10/2026 | 4 | Bandung | 12,950,000 | April |
| Compressor Maintenance & Operation | Cecep Slamet Abadi, S.T., M.T | 4/8/2026 | 4/10/2026 | 3 | Bandung | 7,950,000 | April |
| Electrical and Mechanical Safety | DR. Toto Tohir, ST., MT/ Martono, ST., MT | 4/8/2026 | 4/10/2026 | 3 | Bandung | 7,950,000 | April |
| Fundamental of Machinary Lubrication | Cecep Slamet Abadi, S.T., M.T | 4/13/2026 | 4/15/2026 | 3 | Bandung | 7,950,000 | April |
| Maintenance & Reliability for Oil and Gas Upstream Operation | Ir. Deddy Nugraha, CMRP and Team | 4/13/2026 | 4/15/2026 | 3 | Bandung | 9,500,000 | April |
| Electrical Safety, Theory & Application | Supriyanto, S.T., M.T/ Ali Mashar, M.Eng.Sc., IPU | 4/13/2026 | 4/15/2026 | 3 | Bandung | 7,950,000 | April |
| Business Continuity Management | DR. Djadja Achmad Sardjana S.T., M.M. | 4/14/2026 | 4/16/2026 | 3 | Bandung | 7,950,000 | April |
| Gas Production Optimization | Prof. Dr.-Ing. Bonar Tua Halomoan Marbun | 4/14/2026 | 4/17/2026 | 4 | Bandung | 12,950,000 | April |
| Hazard & Operability Studies (HAZOPS) & Hazard Identification Study (HAZIDS) | Ir. Alfia Djabar | 4/15/2026 | 4/17/2026 | 3 | Jakarta | 7,950,000 | April |
| Coal Dust Explosion | Marhan Saub | 4/20/2026 | 4/21/2026 | 2 | Bandung | 5,950,000 | April |
| Hydraulic & Pneumatic (Practical & Theory) | Adri Maldi Subardjah, B.Eng. (Hons)., M.Sc. And Team | 4/21/2026 | 4/24/2026 | 4 | Bandung | 10,950,000 | April |
| Logistics and Supply Change Management | Ir. R. Iim Takwim, ST., MM., IPM., ASEAN.Eng., ACPE | 4/21/2026 | 4/23/2026 | 3 | Bandung | 7,950,000 | April |
| Formation Damage & Well Stimulation | Prof. Dr.-Ing. Bonar Tua Halomoan Marbun | 4/21/2026 | 4/23/2026 | 3 | Jakarta | 7,950,000 | April |
| Microsoft Project Powerfull Tool for Project Management | Andika Bayu Saputra, S.Kom, M.Kom | 4/22/2026 | 4/24/2026 | 3 | Yogyakarta | 7,950,000 | April |
| Operasi Sistem BOP (Balance of Plant) Pembangkit Thermal | Maridjo, Drs, S.T., M.T | 4/22/2026 | 4/24/2026 | 3 | Bandung | 7,950,000 | April |
| Marginal Field Development | Prof. Dr.-Ing. Bonar Tua Halomoan Marbun | 4/22/2026 | 4/24/2026 | 3 | Bandung | 10,950,000 | April |
| Pipeline Corrosion & Scale Integrity Management | Ir. Ifan Rifandi, M.T. | 4/27/2026 | 4/29/2026 | 3 | Bandung | 7,950,000 | April |
| Pemeriksaan & Pengujian Electrical Grounding system | Ir. Nana Heryana, S.T. IPU., ASEAN.Eng | 4/27/2026 | 4/29/2026 | 3 | Bandung | 7,950,000 | April |
| Sand Control Management | Prof. Dr.-Ing. Bonar Tua Halomoan Marbun | 4/27/2026 | 4/29/2026 | 3 | Bandung | 10,950,000 | April |
| Preventive and Predictive Maintenance | Cecep Slamet Abadi, S.T., M.T | 4/28/2026 | 4/30/2026 | 3 | Bandung | 7,950,000 | April |
| Fundamental Project Management | DR. Djadja Achmad Sardjana S.T., M.M. | 4/28/2026 | 4/29/2026 | 2 | Bandung | 5,950,000 | April |
| Quality Control Mesin Saat Pemeliharaan dan Overhaul | Ir. Deddy Nugraha, CMRP and Team | 4/28/2026 | 4/30/2026 | 3 | Bandung | 9,500,000 | April |
| Warehousing Operation Management System | Ir. R. Iim Takwim, ST., MM., IPM., ASEAN.Eng., ACPE | 4/28/2026 | 4/30/2026 | 3 | Bandung | 7,950,000 | April |
| Programmable Logic Controller (PLC) Principle, Practice and Trouble Shooting | Prof. Endra Joelianto, Ir., Ph.D., SMIEEE | 4/28/2026 | 4/30/2026 | 3 | Bandung | 7,950,000 | April |
| Big Data & Cloud Computing | Andika Bayu Saputra, S.Kom, M.Kom | 5/4/2026 | 5/5/2026 | 2 | Jakarta | 5,950,000 | May |
| Asset Performance Management | Ir. Deddy Nugraha, CMRP and Team | 5/4/2026 | 5/6/2026 | 3 | Bandung | 7,950,000 | May |
| Boiler Control & Burner Management System | Ir. In Jumanda Kasdadi, M.T. | 5/4/2026 | 5/6/2026 | 3 | Bandung | 7,950,000 | May |
| Gas Turbine & Compressor Operation & Maintenance | Maridjo, Drs, S.T., M.T | 5/4/2026 | 5/6/2026 | 3 | Bandung | 7,950,000 | May |
| Flow Assurance for Pipeline System | Prof. Endra Joelianto, Ir., Ph.D., SMIEEE | 5/4/2026 | 5/6/2026 | 3 | Bandung | 7,950,000 | May |
| Medium Voltage (MV) Electric Switchgear & Circuit Breaker | Supriyanto, S.T., M.T | 5/4/2026 | 5/6/2026 | 3 | Bandung | 7,950,000 | May |
| Failure Mode and Effect Analysis | Ir. Deddy Nugraha, CMRP and Team | 5/5/2026 | 5/7/2026 | 3 | Bandung | 9,500,000 | May |
| Drilling & Completion Well Integrity | Prof. Dr.-Ing. Bonar Tua Halomoan Marbun | 5/5/2026 | 5/8/2026 | 4 | Bandung | 12,950,000 | May |
| Business Prosess & Change Management | DR. Djadja Achmad Sardjana S.T., M.M. | 5/6/2026 | 5/8/2026 | 3 | Bandung | 7,950,000 | May |
| Basic Process Engineering Design | Ir. Ella Meilia, IPU | 5/11/2026 | 5/13/2026 | 3 | Bandung | 7,500,000 | May |
| Lock Out Tag Out (LOTO) | Ir. Irawadi Prihaswan, MK3, Dipl. Geoth. | 5/11/2026 | 5/13/2026 | 3 | Bandung | 7,950,000 | May |
| Compressors and Dry Gas Seal System Operation & Maintenance | Kurniawan M Rifa’i | 5/11/2026 | 5/12/2026 | 2 | Tangerang | 16,950,000 | May |
| Operasi Coal Handling PLTU Batubara | Maridjo, Drs, S.T., M.T | 5/11/2026 | 5/13/2026 | 3 | Bandung | 7,950,000 | May |
| Electrical Power Distribution & Protection System | Supriyanto, S.T., M.T | 5/11/2026 | 5/13/2026 | 3 | Bandung | 7,950,000 | May |
| Project Control Management | DR. Djadja Achmad Sardjana S.T., M.M. & Ir. Denny S | 5/11/2026 | 5/13/2026 | 3 | Bandung | 7,950,000 | May |
| Gas Gathering, Piping & Measurement System | Prof. Dr.-Ing. Bonar Tua Halomoan Marbun | 5/12/2026 | 5/15/2026 | 4 | Bandung | 12,950,000 | May |
| Heat Exchanger, Design, Operation & Maintenance | Ir. In Jumanda Kasdadi, M.T. | 5/13/2026 | 5/15/2026 | 3 | Bandung | 7,950,000 | May |
| Maintenance Performance Indicator | Ir. Deddy Nugraha, CMRP and Team | 5/18/2026 | 5/20/2026 | 3 | Bandung | 9,500,000 | May |
| Perencanaan Strategi Pemeliharaan Peralatan Pembangkit | Maridjo, Drs, S.T., M.T | 5/18/2026 | 5/20/2026 | 3 | Bandung | 7,950,000 | May |
| Oil & Gas Measurement & Metering Custody | Prof. Endra Joelianto, Ir., Ph.D., SMIEEE | 5/18/2026 | 5/20/2026 | 3 | Bandung | 7,950,000 | May |
| Maintenance & Reliability for oil and gas upstream operation | Ir. Deddy Nugraha, CMRP and Team | 5/19/2026 | 5/21/2026 | 3 | Bandung | 9,500,000 | May |
| Teknik dan Metode Penyusunan HPS/OE, Untuk Pengadaan Barang & Jasa Serta Project Management | Ir. Asep Saefulbachri Ramli, MBA., MM., IPU | 5/20/2026 | 5/22/2026 | 3 | Bandung | 7,950,000 | May |
| Process Safety Management | Ir. In Jumanda Kasdadi, M.T. | 5/20/2026 | 5/22/2026 | 3 | Bandung | 7,950,000 | May |
| Stuck Pipe Prevention | Prof. Dr.-Ing. Bonar Tua Halomoan Marbun | 5/20/2026 | 5/22/2026 | 3 | Bandung | 10,950,000 | May |
| Condition Based Maintenance | Cecep Slamet Abadi, S.T., M.T | 6/1/2026 | 6/3/2026 | 3 | Bandung | 7,950,000 | |
| Safety & Shutdown System | Prof. Endra Joelianto, Ir., Ph.D., SMIEEE | 6/1/2026 | 6/3/2026 | 3 | Bandung | 7,950,000 | |
| Contract Writing, Planning & Basic Management | DR. Nina Nurani S.H., M.Si, CPHCPM | 6/2/2026 | 6/4/2026 | 3 | Bandung | 7,950,000 | |
| Advance Electrical Power Distribution & Protection System | Ir. Nana Heryana, S.T. IPU., ASEAN.Eng | 6/2/2026 | 6/4/2026 | 3 | Bandung | 7,950,000 | |
| Applied Reservoir Engineering | Prof. Dr.-Ing. Bonar Tua Halomoan Marbun | 6/2/2026 | 6/4/2026 | 3 | Bandung | 10,950,000 | |
| Cathodic Protection, Theory & Practice | Rinto Suhendra, ST & Team | 6/2/2026 | 6/4/2026 | 3 | Bandung | 7,950,000 | |
| Life Cycle Cost Management | Ir. Deddy Nugraha, CMRP and Team | 6/3/2026 | 6/5/2026 | 3 | Bandung | 9,500,000 | |
| Supervisi Pekerjaan Coal & Ash Handling | Maridjo, Drs, S.T., M.T | 6/3/2026 | 6/5/2026 | 3 | Bandung | 7,950,000 | |
| Electrical Wiring Diagram & Electrical Control System | Supriyanto, S.T., M.T/ Ali Mashar, M.Eng.Sc., IPU | 6/3/2026 | 6/5/2026 | 3 | Bandung | 7,950,000 | |
| Gear Box Selection, Maintenance & Troubleshooting | Cecep Slamet Abadi, S.T., M.T | 6/8/2026 | 6/10/2026 | 3 | Bandung | 7,950,000 | |
| Gas Hazard & Measurement | Ir. In Jumanda Kasdadi, M.T. | 6/8/2026 | 6/10/2026 | 3 | Bandung | 7,950,000 | |
| Power Generator Excitation System | Ir. Nana Heryana, S.T. IPU., ASEAN.Eng | 6/8/2026 | 6/10/2026 | 3 | Bandung | 7,950,000 | |
| Engineering Cost Estimate | Ir. R. Iim Takwim, ST., MM., IPM., ASEAN.Eng., ACPE | 6/8/2026 | 6/10/2026 | 3 | Bandung | 7,950,000 | |
| Integrated Production Optimization of Oil & Gas | Prof. Dr.-Ing. Bonar Tua Halomoan Marbun | 6/8/2026 | 6/10/2026 | 3 | Bandung | 10,950,000 | |
| IT Risk Management | Andika Bayu Saputra, S.Kom, M.Kom | 6/9/2026 | 6/10/2026 | 2 | Jakarta | 5,950,000 | |
| e-Proc Berbasis ICT | DR. Djadja Achmad Sardjana S.T., M.M. | 6/9/2026 | 6/11/2026 | 3 | Bandung | 7,950,000 | |
| Kalibrasi Peralatan Kontrol & Instrumentasi | Ali Mashar, M.Eng.Sc., IPU | 6/10/2026 | 6/12/2026 | 3 | Bandung | 7,950,000 | |
| Maintenance and Reliability Management System (MRMS) | Ir. Deddy Nugraha, CMRP and Team | 6/10/2026 | 6/12/2026 | 3 | Bandung | 9,500,000 | |
| HVAC Operation, Maintenance, & Troubleshooting | Maridjo, Drs, S.T., M.T | 6/10/2026 | 6/12/2026 | 3 | Bandung | 7,950,000 | |
| Pemeliharaan Proteksi Peralatan Elektrikal & Supervisory Pembangkit | Supriyanto, S.T., M.T/ Ali Mashar, M.Eng.Sc., IPU | 6/10/2026 | 6/12/2026 | 3 | Bandung | 7,950,000 | |
| Powerful Database Analysis & Dashboard Reporting using Microsoft Excel | Andika Bayu Saputra, S.Kom, M.Kom | 6/15/2026 | 6/16/2026 | 2 | Jakarta | 5,950,000 | |
| Enhance Oil Recovery (EOR) | Prof. Dr.-Ing. Bonar Tua Halomoan Marbun | 6/15/2026 | 6/17/2026 | 3 | Bandung | 10,950,000 | |
| Process Control & Instrument System | Prof. Endra Joelianto, Ir., Ph.D., SMIEEE | 6/15/2026 | 6/17/2026 | 3 | Bandung | 7,950,000 | |
| Turbo Machinery Operation & Maintenance | I. Parno Rahajo, M.Sc., Ph.D. | 6/17/2026 | 6/19/2026 | 3 | Bandung | 7,950,000 | |
| Onshore Facilities Infrastructure-Design, Constructions & Operation Optimization | Ir. Agus Ibrahim | 6/17/2026 | 6/19/2026 | 3 | Jakarta | 7,950,000 | |
| Integrity Chemical Treatment and Selection | Ir. Alief Bakhtiar Mohammad Nurdin | 6/17/2026 | 6/19/2026 | 3 | Bandung | 7,950,000 | |
| Analisa & Evaluasi Perencanaan Strategi Pemeliharaan Pembangkit | Maridjo, Drs, S.T., M.T | 6/17/2026 | 6/19/2026 | 3 | Bandung | 7,950,000 | |
| Operasi & Perawatan Pembangkit Listrik Tenaga Uap (PLTU) | Cecep Slamet Abadi, S.T., M.T | 6/22/2026 | 6/24/2026 | 3 | Bandung | 7,950,000 | |
| P&ID dan Logic Diagram Pembangkit | DR. Toto Tohir, ST., MT/ Martono, ST., MT | 6/22/2026 | 6/24/2026 | 3 | Bandung | 7,950,000 | |
| RAMS (Reliability, Availability, Maintainability & Safety) | Ir. Deddy Nugraha, CMRP and Team | 6/22/2026 | 6/24/2026 | 3 | Bandung | 9,500,000 | |
| Oil Water Treatment Technology | Ir. In Jumanda Kasdadi, M.T. | 6/22/2026 | 6/24/2026 | 3 | Bandung | 7,950,000 | |
| Drilling Problems Analysis | Prof. Dr.-Ing. Bonar Tua Halomoan Marbun | 6/22/2026 | 6/24/2026 | 3 | Bandung | 10,950,000 | |
| Distributed Control System (DCS) Operation & Maintenance | Prof. Endra Joelianto, Ir., Ph.D., SMIEEE | 6/22/2026 | 6/24/2026 | 3 | Bandung | 7,950,000 | |
| Pengujian & Kalibrasi Proteksi Peralatan Electrical Pembangkit | Supriyanto, S.T., M.T | 6/23/2026 | 6/25/2026 | 3 | Bandung | 7,950,000 | |
| Project Control & Scheduling, Using MS Project | DR. Djadja Achmad Sardjana S.T., M.M. | 6/24/2026 | 6/26/2026 | 3 | Bandung | 7,950,000 | |
| PSC Business & Profit Sharing Funds | Benny Lubiantara/ DR. A Rinto Pudyantoro, MM, Ak, CA | 6/24/2026 | 6/26/2026 | 3 | Jakarta | 14,500,000 | |
| POD, WP&B, and AFE in Oil and Gas Industry | Benny Lubiantara/ DR. A Rinto Pudyantoro, MM, Ak, CA | 6/25/2026 | 6/26/2026 | 2 | Jakarta/ Bandung | 14,950,000 | |
| Introduction to FEED (Front End Engineering Design) | Ir. Deddy Nugraha, CMRP and Team | 6/29/2026 | 7/1/2026 | 3 | Bandung | 9,500,000 | |
| Centrifugal Pump, Design Operation & Maintenance | Cecep Slamet Abadi, S.T., M.T | 7/1/2026 | 7/3/2026 | 3 | Bandung | 7,950,000 | |
| Boiler & System Operation | Maridjo, Drs, S.T., M.T | 7/1/2026 | 7/3/2026 | 3 | Bandung | 7,950,000 | |
| Condition Based Maintenance | Cecep Slamet Abadi, S.T., M.T | 7/6/2026 | 7/8/2026 | 3 | Bandung | 7,950,000 | |
| Risk Based Inspection (RBI) | Ir. Deddy Nugraha, CMRP and Team | 7/6/2026 | 7/8/2026 | 3 | Bandung | 9,500,000 | |
| Gas & Diesel Engines | Maridjo, Drs, S.T., M.T | 7/6/2026 | 7/8/2026 | 3 | Bandung | 7,950,000 | |
| Hydraulic Fracturing Applications | Prof. Dr.-Ing. Bonar Tua Halomoan Marbun | 7/6/2026 | 7/8/2026 | 3 | Bandung | 10,950,000 | |
| Electrical, Instrument & Control System | Prof. Endra Joelianto, Ir., Ph.D., SMIEEE | 7/6/2026 | 7/8/2026 | 3 | Bandung | 7,950,000 | |
| Electrical Safety, Theory and Application | Supriyanto, S.T., M.T/ Ali Mashar, M.Eng.Sc., IPU | 7/6/2026 | 7/8/2026 | 3 | Bandung | 7,950,000 | |
| Oil & Gas Processing Plants | Ir. In Jumanda Kasdadi, M.T. | 7/7/2026 | 7/9/2026 | 3 | Bandung | 7,950,000 | |
| Balance Score Card, Strategy & Implementation | DR. Djadja Achmad Sardjana S.T., M.M. | 7/8/2026 | 7/10/2026 | 3 | Bandung | 7,950,000 | |
| Project Construction Management | DR. Ir. Syahril, BSCE., M.T., IPU., ASEAN Eng., APEC Eng | 7/8/2026 | 7/10/2026 | 3 | Bandung | 7,950,000 | |
| Process Safety & Asset Integrity Management System | Ir. In Jumanda Kasdadi, M.T. & Ir. Deddy Nugraha, CMRP | 7/8/2026 | 7/10/2026 | 3 | Bandung | 7,950,000 | |
| Produced Water Management | Ir. In Jumanda Kasdadi, M.T./ Vitus Denny/ Alief Bakhtiar | 7/8/2026 | 7/10/2026 | 3 | Bandung | 7,950,000 | |
| Power Plant Performance Test | DR. Willy Adriansyah, ST, MM | 7/13/2026 | 7/15/2026 | 3 | Bandung | 7,950,000 | |
| RCM (Reliability Centered Maintenance) | Ir. Deddy Nugraha, CMRP and Team | 7/13/2026 | 7/15/2026 | 3 | Bandung | 9,500,000 | |
| Process Hazard Analysis (PHA) | Ir. In Jumanda Kasdadi, M.T. | 7/13/2026 | 7/15/2026 | 3 | Bandung | 7,950,000 | |
| Proactive Maintenance | Maridjo, Drs, S.T., M.T | 7/13/2026 | 7/15/2026 | 3 | Bandung | 7,950,000 | |
| Integrated Reservoir Management | Prof. Dr.-Ing. Bonar Tua Halomoan Marbun | 7/13/2026 | 7/15/2026 | 3 | Bandung | 10,950,000 | |
| Operasi Generator & Trafo Daya | Supriyanto, S.T., M.T | 7/13/2026 | 7/15/2026 | 3 | Bandung | 7,950,000 | |
| Microsoft Project Powerfull Tool for Project Management | Andika Bayu Saputra, S.Kom, M.Kom | 7/13/2026 | 7/15/2026 | 3 | Yogyakarta | 7,950,000 | |
| Hydraulic & Pneumatic (Practical & Theory) | Adri Maldi Subardjah, B.Eng. (Hons)., M.Sc. And Team | 7/14/2026 | 7/17/2026 | 4 | Bandung | 10,950,000 | |
| Comprehensive PSC Accounting | DR. A Rinto Pudyantoro, MM, Ak, CA | 7/14/2026 | 7/16/2026 | 3 | Jakarta | 14,500,000 | |
| Relay Protection | DR. Toto Tohir, ST., MT/ Ali Mashar, M.Eng.Sc., IPU | 7/14/2026 | 7/16/2026 | 3 | Bandung | 7,950,000 | |
| Manajemen Aset berbasis ICT (Information Communication Technology) | DR. Djadja Achmad Sardjana S.T., M.M. | 7/15/2026 | 7/17/2026 | 3 | Bandung | 7,950,000 | |
| Sistem Proteksi Pembangkit Listrik | Ir. Nana Heryana, S.T. IPU., ASEAN.Eng | 7/15/2026 | 7/17/2026 | 3 | Bandung | 7,950,000 | |
| Reliability Based Maintenance | Ir. Deddy Nugraha, CMRP and Team | 7/20/2026 | 7/22/2026 | 3 | Bandung | 9,500,000 | |
| Spare Parts Management | Ir. Irfan Zen/ Rusmana, ST., MT | 7/20/2026 | 7/22/2026 | 3 | Bandung | 7,950,000 | |
| O&G Reserves and Resources Evaluation | Prof. Dr.-Ing. Bonar Tua Halomoan Marbun | 7/20/2026 | 7/22/2026 | 3 | Bandung | 10,950,000 | |
| Safety Instrumented System (SIS) and Control | Prof. Endra Joelianto, Ir., Ph.D., SMIEEE | 7/20/2026 | 7/22/2026 | 3 | Bandung | 7,950,000 | |
| Substitution Equipment & Control Relay | Supriyanto, S.T., M.T | 7/20/2026 | 7/22/2026 | 3 | Bandung | 7,950,000 | |
| Supervisi Pengoperasian Sistem BOP (Balance of Plant) | Ali Mashar, M.Eng.Sc., IPU/ Maridjo, Drs, ST., MT | 7/21/2026 | 7/23/2026 | 3 | Bandung | 7,950,000 | |
| Tribology Oil Analysis | Cecep Slamet Abadi, S.T., M.T | 7/21/2026 | 7/23/2026 | 3 | Bandung | 7,950,000 | |
| Warehousing Operation Management System | Ir. R. Iim Takwim, ST., MM., IPM., ASEAN.Eng., ACPE | 7/21/2026 | 7/23/2026 | 3 | Bandung | 7,950,000 | |
| IT Resources Management System | Andika Bayu Saputra, S.Kom, M.Kom | 7/22/2026 | 7/24/2026 | 3 | Bandung | 7,950,000 | |
| Oil & Gas Fields, Economics & Commercial Aspects of POD, WP&B | Benny Lubiantara | 7/22/2026 | 7/23/2026 | 2 | Jakarta/ Bandung | 14,950,000 | |
| Mechanical Seal for Rotating Equipment | Cecep Slamet Abadi, S.T., M.T | 7/22/2026 | 7/24/2026 | 3 | Bandung | 7,950,000 | |
| Solusi Infrastruktur Jaringan Komputer berbasis CISCO | DR. Djadja Achmad Sardjana S.T., M.M. | 7/22/2026 | 7/24/2026 | 3 | Bandung | 7,950,000 | |
| Operation Readiness, Hand Over & Assurance | Ir. Dody Lesmana | 7/22/2026 | 7/24/2026 | 3 | Bandung | 7,950,000 | |
| Remaining Life Assessment (RLA) | Ir. Deddy Nugraha, CMRP and Team | 7/27/2026 | 7/29/2026 | 3 | Bandung | 9,500,000 | |
| Downhole & Surface Production Equipment | Prof. Dr.-Ing. Bonar Tua Halomoan Marbun | 7/27/2026 | 7/30/2026 | 4 | Bandung | 12,950,000 | |
| Flow & Level Custody Measurement | Prof. Endra Joelianto, Ir., Ph.D., SMIEEE | 7/27/2026 | 7/29/2026 | 3 | Bandung | 7,950,000 | |
| API 580 – Risk Based Inspection and Maintenance, Repair | Ir. In Jumanda Kasdadi, M.T. | 7/28/2026 | 7/30/2026 | 3 | Bandung | 7,950,000 | |
| Basic Petroleum Resources Management System (PRMS) | Ir. Sudiharto, M.T. | 7/28/2026 | 7/30/2026 | 3 | Bandung | 7,950,000 | |
| Hazardous Area Classification and Installation | Ir. Irawadi Prihaswan, MK3, Dipl. Geoth. | 7/29/2026 | 7/31/2026 | 3 | Bandung | 7,950,000 | |
| BOILER (Pengoperasian Burner System: Coal, Main Oil Gun, Tiny Oil Gun) | Cecep Slamet Abadi, S.T., M.T | 8/3/2026 | 8/5/2026 | 3 | Bandung | 7,950,000 | |
| Asset Integrity Management System (AIMS) | Ir. Deddy Nugraha, CMRP and Team | 8/3/2026 | 8/5/2026 | 3 | Bandung | 7,950,000 | |
| Safety Engineering in Design | Ir. In Jumanda Kasdadi, M.T. | 8/3/2026 | 8/5/2026 | 3 | Bandung | 7,950,000 | |
| Sand Control Management | Prof. Dr.-Ing. Bonar Tua Halomoan Marbun | 8/3/2026 | 8/5/2026 | 3 | Bandung | 10,950,000 | |
| Safety & Shutdown System | Prof. Endra Joelianto, Ir., Ph.D., SMIEEE | 8/3/2026 | 8/5/2026 | 3 | Bandung | 7,950,000 | |
| Coal Quality & Handling for Power Plant | Slamet Suprapto, M.Sc | 8/3/2026 | 8/5/2026 | 3 | Bandung | 7,950,000 | |
| Business Continuity Management | DR. Djadja Achmad Sardjana S.T., M.M. | 8/4/2026 | 8/6/2026 | 3 | Bandung | 7,950,000 | |
| Hazard & Operability Studies (HAZOPS) & Hazard Identification Study (HAZIDS) | Ir. Alfia Djabar | 8/4/2026 | 8/6/2026 | 3 | Jakarta | 7,950,000 | |
| Basic Drilling & Well Completion | Ir. Arwansyah Johan | 8/4/2026 | 8/6/2026 | 3 | Bandung | 7,950,000 | |
| Logistics and Supply Change Management | Ir. R. Iim Takwim, ST., MM., IPM., ASEAN.Eng., ACPE | 8/5/2026 | 8/7/2026 | 3 | Bandung | 7,950,000 | |
| Manajemen Risiko Sesuai ISO 31000 | Ir. Suharto, MBA | 8/5/2026 | 8/7/2026 | 3 | Bandung | 7,950,000 | |
| Operasi Sistem BOP (Balance of Plant) Pembangkit Thermal | Maridjo, Drs, S.T., M.T | 8/5/2026 | 8/7/2026 | 3 | Bandung | 7,950,000 | |
| Quality Control Mesin Saat Pemeliharaan dan Overhaul | Ir. Deddy Nugraha, CMRP and Team | 8/10/2026 | 8/12/2026 | 3 | Bandung | 9,500,000 | |
| Production Safety System | Ir. In Jumanda Kasdadi, M.T. | 8/10/2026 | 8/12/2026 | 3 | Bandung | 7,950,000 | |
| Pemeriksaan & Pengujian Electrical Grounding system | Ir. Nana Heryana, S.T. IPU., ASEAN.Eng | 8/10/2026 | 8/12/2026 | 3 | Bandung | 7,950,000 | |
| Rig and Equipment Selection | Ir. Steve Hartono | 8/10/2026 | 8/11/2026 | 2 | Bandung | 6,950,000 | |
| Process Control & Instrument System | Prof. Endra Joelianto, Ir., Ph.D., SMIEEE | 8/10/2026 | 8/12/2026 | 3 | Bandung | 7,950,000 | |
| Rotating Equipment Operation & Maintenance | Cecep Slamet Abadi, S.T., M.T | 8/11/2026 | 8/13/2026 | 3 | Bandung | 7,950,000 | |
| Reliability Instrument & Control | Ir. Deddy Nugraha, CMRP, Dwi Fitrianto, S.T | 8/11/2026 | 8/13/2026 | 3 | Bandung | 7,950,000 | |
| Contractor Safety Management System | Ir. Heri Setiawan, MK3 | 8/11/2026 | 8/13/2026 | 3 | Bandung | 7,950,000 | |
| Safety Integrity Level (SIL) | Ir. In Jumanda Kasdadi, M.T. | 8/11/2026 | 8/13/2026 | 3 | Bandung | 7,950,000 | |
| Pengoperasian BFPT, Protection & Supervisory System | Ali Mashar, M.Eng.Sc., IPU | 8/12/2026 | 8/14/2026 | 3 | Bandung | 7,950,000 | |
| Technical Projects Document Management | Ir. Anita Sampratiwi & Hani Hendarsih S.Hum | 8/12/2026 | 8/14/2026 | 3 | Jakarta | 8,950,000 | |
| Transformer Maintenance & Operation | Ir. Nana Heryana, S.T. IPU., ASEAN.Eng | 8/12/2026 | 8/14/2026 | 3 | Bandung | 7,950,000 | |
| Supervisi Pengoperasian dan Pemeliharaan Pembangkit Tenaga Listrik | Maridjo, Drs, S.T., M.T | 8/12/2026 | 8/14/2026 | 3 | Bandung | 7,950,000 | |
| Maintenance & Reliability for oil and gas upstream operation | Ir. Deddy Nugraha, CMRP and Team | 8/18/2026 | 8/20/2026 | 3 | Bandung | 9,500,000 | |
| Basic Process Safety for Operation Personnel | Ir. In Jumanda Kasdadi, M.T. | 8/18/2026 | 8/20/2026 | 3 | Bandung | 7,950,000 | |
| Applied Reservoir Engineering | Prof. Dr.-Ing. Bonar Tua Halomoan Marbun | 8/18/2026 | 8/20/2026 | 3 | Bandung | 10,950,000 | |
| Vibration Analysis | Cecep Slamet Abadi, S.T., M.T | 8/19/2026 | 8/21/2026 | 3 | Bandung | 7,950,000 | |
| Project Control Management | DR. Djadja Achmad Sardjana S.T., M.M. & Ir. Denny S | 8/19/2026 | 8/21/2026 | 3 | Bandung | 7,950,000 | |
| Introduction to FEED (Front End Engineering Design) | Ir. Deddy Nugraha, CMRP and Team | 8/24/2026 | 8/26/2026 | 3 | Bandung | 9,500,000 | |
| Gas Gathering, Piping & Measurement System | Prof. Dr.-Ing. Bonar Tua Halomoan Marbun | 8/24/2026 | 8/27/2026 | 4 | Bandung | 12,950,000 | |
| Programmable Logic Controller (PLC) Principle, Practice and Trouble Shooting | Prof. Endra Joelianto, Ir., Ph.D., SMIEEE | 8/24/2026 | 8/26/2026 | 3 | Bandung | 7,950,000 | |
| Budgeting & Cost Control | DR. Achmad Fadjar.,S.E.,M.Si.,Ak.,CA | 8/26/2026 | 8/28/2026 | 3 | Bandung | 7,950,000 | |
| e-Proc Berbasis ICT | DR. Djadja Achmad Sardjana S.T., M.M. | 8/26/2026 | 8/28/2026 | 3 | Bandung | 7,950,000 | |
| Maintenance & Repair Process | Ir. Irfan Zen | 8/26/2026 | 8/28/2026 | 3 | Bandung | 7,950,000 | |
| Big Data & Cloud Computing | Andika Bayu Saputra, S.Kom, M.Kom | 9/1/2026 | 9/2/2026 | 2 | Jakarta | 5,950,000 | |
| Boiler Control & Burner Management System | Ir. In Jumanda Kasdadi, M.T. | 9/1/2026 | 9/3/2026 | 3 | Bandung | 7,950,000 | |
| Supervisi Pengoperasian dan Pemeliharaan Pembangkit Tenaga Listrik | Maridjo, Drs, S.T., M.T | 9/1/2026 | 9/3/2026 | 3 | Bandung | 7,950,000 | |
| Gas Production Optimization | Prof. Dr.-Ing. Bonar Tua Halomoan Marbun | 9/1/2026 | 9/4/2026 | 4 | Bandung | 12,950,000 | |
| Compressor Operation & Maintenance | Cecep Slamet Abadi, S.T., M.T | 9/2/2026 | 9/4/2026 | 3 | Bandung | 7,950,000 | |
| Advanced Instrumentation Control System Engineering | Prof. Endra Joelianto, Ir., Ph.D., SMIEEE | 9/2/2026 | 9/4/2026 | 3 | Bandung | 7,950,000 | |
| Cathodic Protection, Theory & Practice | Rinto Suhendra, ST & Team | 9/2/2026 | 9/4/2026 | 3 | Bandung | 7,950,000 | |
| Electric Motor Operation, Maintenance & Troubleshooting | Supriyanto, S.T., M.T | 9/2/2026 | 9/4/2026 | 3 | Bandung | 7,950,000 | |
| Fundamentals of Machinery Lubrication | Cecep Slamet Abadi, S.T., M.T | 9/7/2026 | 9/9/2026 | 3 | Bandung | 7,950,000 | |
| Asset Performance Management | Ir. Deddy Nugraha, CMRP and Team | 9/7/2026 | 9/9/2026 | 3 | Bandung | 7,950,000 | |
| Marginal Field Development | Prof. Dr.-Ing. Bonar Tua Halomoan Marbun | 9/7/2026 | 9/9/2026 | 3 | Bandung | 10,950,000 | |
| Programmable Logic Controller (PLC) Principle, Practice and Trouble Shooting | Prof. Endra Joelianto, Ir., Ph.D., SMIEEE | 9/7/2026 | 9/9/2026 | 3 | Bandung | 7,950,000 | |
| Business Prosess & Change Management | DR. Djadja Achmad Sardjana S.T., M.M. | 9/8/2026 | 9/10/2026 | 3 | Bandung | 7,950,000 | |
| Gas Turbine & Compressor Operation & Maintenance | Maridjo, Drs, S.T., M.T | 9/8/2026 | 9/10/2026 | 3 | Bandung | 7,950,000 | |
| Heat Exchanger, Design, Operation & Maintenance | Ir. In Jumanda Kasdadi, M.T. | 9/9/2026 | 9/11/2026 | 3 | Bandung | 7,950,000 | |
| Lock Out Tag Out (LOTO) | Ir. Irawadi Prihaswan, MK3, Dipl. Geoth. | 9/9/2026 | 9/11/2026 | 3 | Bandung | 7,950,000 | |
| Formation Damage & Well Stimulation | Prof. Dr.-Ing. Bonar Tua Halomoan Marbun | 9/9/2026 | 9/11/2026 | 3 | Jakarta | 7,950,000 | |
| Compressors and Dry Gas Seal System Operation & Maintenance | Kurniawan M Rifa’i | 9/7/2026 | 9/8/2026 | 2 | Tangerang | 16,950,000 | |
| Electrical Power Distribution & Protection System | Supriyanto, S.T., M.T | 9/9/2026 | 9/11/2026 | 3 | Bandung | 7,950,000 | |
| Asset Register Development Based on ISO 14224 | Ir. Deddy Nugraha, CMRP and Team | 9/14/2026 | 9/16/2026 | 3 | Jakarta | 9,500,000 | |
| Basic Process Engineering Design | Ir. Ella Meilia, IPU | 9/14/2026 | 9/16/2026 | 3 | Bandung | 7,500,000 | |
| Drilling & Completion Well Integrity | Prof. Dr.-Ing. Bonar Tua Halomoan Marbun | 9/14/2026 | 9/17/2026 | 4 | Bandung | 12,950,000 | |
| SCADA (Supervisory Control & Data Acquisition) Operation & Maintenance | Prof. Endra Joelianto, Ir., Ph.D., SMIEEE | 9/14/2026 | 9/16/2026 | 3 | Bandung | 7,950,000 | |
| P&ID dan Logic Diagram Pembangkit | DR. Toto Tohir, ST., MT/ Martono, ST., MT | 9/15/2026 | 9/17/2026 | 3 | Bandung | 7,950,000 | |
| Operasi Coal Handling PLTU Batubara | Maridjo, Drs, S.T., M.T | 9/15/2026 | 9/17/2026 | 3 | Bandung | 7,950,000 | |
| IT Strategic Plan, Operation & Tactical | DR. Djadja Achmad Sardjana S.T., M.M. | 9/16/2026 | 9/18/2026 | 3 | Bandung | 7,950,000 | |
| Pipeline Corrosion & Scale Integrity Management | Ir. Ifan Rifandi, M.T. | 9/16/2026 | 9/18/2026 | 3 | Bandung | 7,950,000 | |
| Process Safety Management | Ir. In Jumanda Kasdadi, M.T. | 9/16/2026 | 9/18/2026 | 3 | Bandung | 7,950,000 | |
| Preventive andPreventive and Predictive Maintenance Predictive Maintenance | Cecep Slamet Abadi, S.T., M.T | 9/21/2026 | 9/23/2026 | 3 | Bandung | 7,950,000 | |
| Failure Mode and Effect Analysis | Ir. Deddy Nugraha, CMRP and Team | 9/21/2026 | 9/23/2026 | 3 | Bandung | 9,500,000 | |
| Safety and Risk Management in Oil & Gas | Ir. In Jumanda Kasdadi, M.T. | 9/21/2026 | 9/23/2026 | 3 | Bandung | 7,950,000 | |
| Stuck Pipe Prevention | Prof. Dr.-Ing. Bonar Tua Halomoan Marbun | 9/21/2026 | 9/23/2026 | 3 | Bandung | 10,950,000 | |
| Electrical, Instrument & Control System | Prof. Endra Joelianto, Ir., Ph.D., SMIEEE | 9/21/2026 | 9/23/2026 | 3 | Bandung | 7,950,000 | |
| Tribology Oil Analysis | Cecep Slamet Abadi, S.T., M.T | 9/22/2026 | 9/24/2026 | 3 | Bandung | 7,950,000 | |
| Oil & Gas Fields, Economics & Commercial Aspects of POD, WP&B | Benny Lubiantara | 9/23/2026 | 9/24/2026 | 2 | Jakarta/ Bandung | 14,950,000 | |
| Manajemen Aset berbasis ICT (Information Communication Technology) | DR. Djadja Achmad Sardjana S.T., M.M. | 9/23/2026 | 9/25/2026 | 3 | Bandung | 7,950,000 | |
| Electrical Wiring Diagram & Electrical Control System | Supriyanto, S.T., M.T/ Ali Mashar, M.Eng.Sc., IPU | 9/23/2026 | 9/25/2026 | 3 | Bandung | 7,950,000 | |
| Hubungan Industrial dan Human Resources Management | DR. Nina Nurani S.H., M.Si, CPHCPM | 9/28/2026 | 9/30/2026 | 3 | Bandung | 7,950,000 | |
| Maintenance Performance Indicator | Ir. Deddy Nugraha, CMRP and Team | 9/28/2026 | 9/30/2026 | 3 | Bandung | 9,500,000 | |
| Construction Completion Management System (CCMS) | Ir. Dody Lesmana | 9/28/2026 | 9/30/2026 | 3 | Bandung | 7,950,000 | |
| BOILER (Pengoperasian Burner System: Coal, Main Oil Gun, Tiny Oil Gun) | Cecep Slamet Abadi, S.T., M.T | 10/5/2026 | 10/7/2026 | 3 | Bandung | 7,950,000 | |
| Contract Writing, Planning & Basic Management | DR. Nina Nurani S.H., M.Si, CPHCPM | 10/5/2026 | 10/7/2026 | 3 | Bandung | 7,950,000 | |
| Life Cycle Cost Management | Ir. Deddy Nugraha, CMRP and Team | 10/5/2026 | 10/7/2026 | 3 | Bandung | 9,500,000 | |
| Advance Electrical Power Distribution & Protection System | Ir. Nana Heryana, S.T. IPU., ASEAN.Eng | 10/5/2026 | 10/7/2026 | 3 | Bandung | 7,950,000 | |
| Analisa & Evaluasi Perencanaan Strategi Pemeliharaan Pembangkit | Maridjo, Drs, S.T., M.T | 10/5/2026 | 10/7/2026 | 3 | Bandung | 7,950,000 | |
| Gas Production Optimization | Prof. Dr.-Ing. Bonar Tua Halomoan Marbun | 10/5/2026 | 10/8/2026 | 4 | Bandung | 12,950,000 | |
| Flow Assurance for Pipeline System | Prof. Endra Joelianto, Ir., Ph.D., SMIEEE | 10/5/2026 | 10/7/2026 | 3 | Bandung | 7,950,000 | |
| Medium Voltage (MV) Electric Switchgear & Circuit Breaker | Supriyanto, S.T., M.T | 10/5/2026 | 10/7/2026 | 3 | Bandung | 7,950,000 | |
| Electrical and Mechanical Safety | DR. Toto Tohir, ST., MT/ Martono, ST., MT | 10/6/2026 | 10/8/2026 | 3 | Bandung | 7,950,000 | |
| Gas Hazard & Measurement | Ir. In Jumanda Kasdadi, M.T. | 10/7/2026 | 10/9/2026 | 3 | Bandung | 7,950,000 | |
| Power Generator Excitation System | Ir. Nana Heryana, S.T. IPU., ASEAN.Eng | 10/7/2026 | 10/9/2026 | 3 | Bandung | 7,950,000 | |
| Coal Dust Explosion | Marhan Saub | 10/7/2026 | 10/8/2026 | 2 | Bandung | 5,950,000 | |
| Kalibrasi Peralatan Kontrol & Instrumentasi | Ali Mashar, M.Eng.Sc., IPU | 10/12/2026 | 10/14/2026 | 3 | Bandung | 7,950,000 | |
| IT Risk Management | Andika Bayu Saputra, S.Kom, M.Kom | 10/12/2026 | 10/13/2026 | 2 | Jakarta | 5,950,000 | |
| Gear Box Selection, Maintenance & Troubleshooting | Cecep Slamet Abadi, S.T., M.T | 10/12/2026 | 10/14/2026 | 3 | Bandung | 7,950,000 | |
| Comprehensive PSC Accounting | DR. A Rinto Pudyantoro, MM, Ak, CA | 10/12/2026 | 10/14/2026 | 3 | Jakarta | 14,500,000 | |
| e-Proc Berbasis ICT | DR. Djadja Achmad Sardjana S.T., M.M. | 10/12/2026 | 10/14/2026 | 3 | Bandung | 7,950,000 | |
| Maintenance and Reliability Management System (MRMS) | Ir. Deddy Nugraha, CMRP and Team | 10/12/2026 | 10/14/2026 | 3 | Bandung | 9,500,000 | |
| Proactive Maintenance | Maridjo, Drs, S.T., M.T | 10/12/2026 | 10/14/2026 | 3 | Bandung | 7,950,000 | |
| Drilling Problems Analysis | Prof. Dr.-Ing. Bonar Tua Halomoan Marbun | 10/12/2026 | 10/14/2026 | 3 | Bandung | 10,950,000 | |
| Safety & Shutdown System | Prof. Endra Joelianto, Ir., Ph.D., SMIEEE | 10/12/2026 | 10/14/2026 | 3 | Bandung | 7,950,000 | |
| Operasi Generator & Trafo Daya | Supriyanto, S.T., M.T | 10/12/2026 | 10/14/2026 | 3 | Bandung | 7,950,000 | |
| Hydraulic & Pneumatic (Practical & Theory) | Adri Maldi Subardjah, B.Eng. (Hons)., M.Sc. And Team | 10/13/2026 | 10/16/2026 | 4 | Bandung | 10,950,000 | |
| Onshore Facilities Infrastructure-Design, Constructions & Operation Optimization | Ir. Agus Ibrahim | 10/13/2026 | 10/15/2026 | 3 | Jakarta | 7,950,000 | |
| Oil & Gas Processing Plants | Ir. In Jumanda Kasdadi, M.T. | 10/13/2026 | 10/15/2026 | 3 | Bandung | 7,950,000 | |
| Oil Water Treatment Technology | Ir. In Jumanda Kasdadi, M.T. | 10/14/2026 | 10/16/2026 | 3 | Bandung | 7,950,000 | |
| Powerful Database Analysis & Dashboard Reporting using Microsoft Excel | Andika Bayu Saputra, S.Kom, M.Kom | 10/19/2026 | 10/20/2026 | 2 | Jakarta | 5,950,000 | |
| Teknik dan Metode Penyusunan HPS/OE, Untuk Pengadaan Barang & Jasa Serta Project Management | Ir. Asep Saefulbachri Ramli, MBA., MM., IPU | 10/19/2026 | 10/21/2026 | 3 | Bandung | 7,950,000 | |
| RAMS (Reliability, Availability, Maintainability & Safety) | Ir. Deddy Nugraha, CMRP and Team | 10/19/2026 | 10/21/2026 | 3 | Bandung | 9,500,000 | |
| Downhole & Surface Production Equipment | Prof. Dr.-Ing. Bonar Tua Halomoan Marbun | 10/19/2026 | 10/22/2026 | 4 | Bandung | 12,950,000 | |
| Safety Instrumented System (SIS) and Control | Prof. Endra Joelianto, Ir., Ph.D., SMIEEE | 10/19/2026 | 10/21/2026 | 3 | Bandung | 7,950,000 | |
| Pemeliharaan Proteksi Peralatan Elektrikal & Supervisory Pembangkit | Supriyanto, S.T., M.T/ Ali Mashar, M.Eng.Sc., IPU | 10/19/2026 | 10/21/2026 | 3 | Bandung | 7,950,000 | |
| POD, WP&B, and AFE in Oil and Gas Industry | Benny Lubiantara/ DR. A Rinto Pudyantoro, MM, Ak, CA | 10/20/2026 | 10/21/2026 | 2 | Jakarta/ Bandung | 14,950,000 | |
| Solusi Infrastruktur Jaringan Komputer berbasis CISCO | DR. Djadja Achmad Sardjana S.T., M.M. | 10/20/2026 | 10/22/2026 | 3 | Bandung | 7,950,000 | |
| Relay Protection | DR. Toto Tohir, ST., MT/ Ali Mashar, M.Eng.Sc., IPU | 10/20/2026 | 10/22/2026 | 3 | Bandung | 7,950,000 | |
| Project Control & Scheduling, Using MS Project | DR. Djadja Achmad Sardjana S.T., M.M. | 10/21/2026 | 10/23/2026 | 3 | Bandung | 7,950,000 | |
| Rotating Equipment Operation & Maintenance | Cecep Slamet Abadi, S.T., M.T | 10/21/2026 | 10/23/2026 | 3 | Bandung | 7,950,000 | |
| Sistem Proteksi Pembangkit Listrik | Ir. Nana Heryana, S.T. IPU., ASEAN.Eng | 10/21/2026 | 10/23/2026 | 3 | Bandung | 7,950,000 | |
| Supervisi Pekerjaan Coal & Ash Handling | Maridjo, Drs, S.T., M.T | 10/21/2026 | 10/23/2026 | 3 | Bandung | 7,950,000 | |
| Pengoperasian BFPT, Protection & Supervisory System | Ali Mashar, M.Eng.Sc., IPU | 10/26/2026 | 10/28/2026 | 3 | Bandung | 7,950,000 | |
| Mechanical Seal for Rotating Equipment | Cecep Slamet Abadi, S.T., M.T | 10/26/2026 | 10/28/2026 | 3 | Bandung | 7,950,000 | |
| Risk Based Inspection (RBI) | Ir. Deddy Nugraha, CMRP and Team | 10/26/2026 | 10/28/2026 | 3 | Bandung | 9,500,000 | |
| Engineering Cost Estimate | Ir. R. Iim Takwim, ST., MM., IPM., ASEAN.Eng., ACPE | 10/26/2026 | 10/28/2026 | 3 | Bandung | 7,950,000 | |
| Gas & Diesel Engines | Maridjo, Drs, S.T., M.T | 10/26/2026 | 10/28/2026 | 3 | Bandung | 7,950,000 | |
| Gas Gathering, Piping & Measurement System | Prof. Dr.-Ing. Bonar Tua Halomoan Marbun | 10/26/2026 | 10/29/2026 | 4 | Bandung | 12,950,000 | |
| Pengujian & Kalibrasi Proteksi Peralatan Electrical Pembangkit | Supriyanto, S.T., M.T | 10/26/2026 | 10/28/2026 | 3 | Bandung | 7,950,000 | |
| IT Resources Management System | Andika Bayu Saputra, S.Kom, M.Kom | 10/27/2026 | 10/29/2026 | 3 | Bandung | 7,950,000 | |
| Operation Readiness, Hand Over & Assurance | Ir. Dody Lesmana | 10/27/2026 | 10/29/2026 | 3 | Bandung | 7,950,000 | |
| API 580 – Risk Based Inspection and Maintenance, Repair | Ir. In Jumanda Kasdadi, M.T. | 10/27/2026 | 10/29/2026 | 3 | Bandung | 7,950,000 | |
| Fundamental Projek Manajemen | DR. Djadja Achmad Sardjana S.T., M.M. | 10/28/2026 | 10/29/2026 | 2 | Bandung | 5,950,000 | |
| Hazardous Area Classification and Installation | Ir. Irawadi Prihaswan, MK3, Dipl. Geoth. | 10/28/2026 | 10/30/2026 | 3 | Bandung | 7,950,000 | |
| Centrifugal Pump, Design Operation & Maintenance | Cecep Slamet Abadi, S.T., M.T | 11/2/2026 | 11/4/2026 | 3 | Bandung | 7,950,000 | |
| Asset Integrity Management System (AIMS) | Ir. Deddy Nugraha, CMRP and Team | 11/2/2026 | 11/4/2026 | 3 | Bandung | 7,950,000 | |
| Process Safety Management | Ir. In Jumanda Kasdadi, M.T. | 11/2/2026 | 11/4/2026 | 3 | Bandung | 7,950,000 | |
| Boiler & System Operation | Maridjo, Drs, S.T., M.T | 11/2/2026 | 11/4/2026 | 3 | Bandung | 7,950,000 | |
| Integrated Production Optimization of Oil & Gas | Prof. Dr.-Ing. Bonar Tua Halomoan Marbun | 11/2/2026 | 11/4/2026 | 3 | Bandung | 10,950,000 | |
| Advanced Instrumentation Control System Engineering | Prof. Endra Joelianto, Ir., Ph.D., SMIEEE | 11/2/2026 | 11/4/2026 | 3 | Bandung | 7,950,000 | |
| Cathodic Protection, Theory & Practice | Rinto Suhendra, ST & Team | 11/2/2026 | 11/4/2026 | 3 | Bandung | 7,950,000 | |
| Electric Motor Operation, Maintenance & Troubleshooting | Supriyanto, S.T., M.T | 11/2/2026 | 11/4/2026 | 3 | Bandung | 7,950,000 | |
| Coal Quality & Handling for Power Plant | Slamet Suprapto, M.Sc | 11/3/2026 | 11/5/2026 | 3 | Bandung | 7,950,000 | |
| Fundamentals of Machinery Lubrication | Cecep Slamet Abadi, S.T., M.T | 11/4/2026 | 11/6/2026 | 3 | Bandung | 7,950,000 | |
| Basic Drilling & Well Completion | Ir. Arwansyah Johan | 11/4/2026 | 11/6/2026 | 3 | Bandung | 7,950,000 | |
| Business Continuity Management | DR. Djadja Achmad Sardjana S.T., M.M. | 11/9/2026 | 11/11/2026 | 3 | Bandung | 7,950,000 | |
| Hazard & Operability Studies (HAZOPS) & Hazard Identification Study (HAZIDS) | Ir. Alfia Djabar | 11/9/2026 | 11/11/2026 | 3 | Jakarta | 7,950,000 | |
| Asset Register Development Based on ISO 14224 | Ir. Deddy Nugraha, CMRP and Team | 11/9/2026 | 11/11/2026 | 3 | Jakarta | 9,500,000 | |
| Gas Turbine & Compressor Operation & Maintenance | Maridjo, Drs, S.T., M.T | 11/9/2026 | 11/11/2026 | 3 | Bandung | 7,950,000 | |
| Sand Control Management | Prof. Dr.-Ing. Bonar Tua Halomoan Marbun | 11/9/2026 | 11/11/2026 | 3 | Bandung | 10,950,000 | |
| Electrical Power Distribution & Protection System | Supriyanto, S.T., M.T | 11/9/2026 | 11/11/2026 | 3 | Bandung | 7,950,000 | |
| Production Safety System | Ir. In Jumanda Kasdadi, M.T. | 11/10/2026 | 11/12/2026 | 3 | Bandung | 7,950,000 | |
| Lock Out Tag Out (LOTO) | Ir. Irawadi Prihaswan, MK3, Dipl. Geoth. | 11/10/2026 | 11/12/2026 | 3 | Bandung | 7,950,000 | |
| Formation Damage & Well Stimulation | Prof. Dr.-Ing. Bonar Tua Halomoan Marbun | 11/10/2026 | 11/12/2026 | 3 | Jakarta | 7,950,000 | |
| Compressors and Dry Gas Seal System Operation & Maintenance | Kurniawan M Rifa’i | 11/9/2026 | 11/10/2026 | 2 | Tangerang | 16,950,000 | |
| HVAC Operation, Maintenance, & Troubleshooting | Maridjo, Drs, S.T., M.T | 11/10/2026 | 11/12/2026 | 3 | Bandung | 7,950,000 | |
| Operasi & Perawatan Pembangkit Listrik Tenaga Uap (PLTU) | Cecep Slamet Abadi, S.T., M.T | 11/11/2026 | 11/13/2026 | 3 | Bandung | 7,950,000 | |
| Integrity Chemical Treatment and Selection | Ir. Alief Bakhtiar Mohammad Nurdin | 11/11/2026 | 11/13/2026 | 3 | Bandung | 7,950,000 | |
| Logistics and Supply Change Management | Ir. R. Iim Takwim, ST., MM., IPM., ASEAN.Eng., ACPE | 11/11/2026 | 11/13/2026 | 3 | Bandung | 7,950,000 | |
| Operasi Sistem BOP (Balance of Plant) Pembangkit Thermal | Maridjo, Drs, S.T., M.T | 11/11/2026 | 11/13/2026 | 3 | Bandung | 7,950,000 | |
| Supervisi Pengoperasian Sistem BOP (Balance of Plant) | Ali Mashar, M.Eng.Sc., IPU/ Maridjo, Drs, ST., MT | 11/16/2026 | 11/18/2026 | 3 | Bandung | 7,950,000 | |
| Microsoft Project Powerfull Tool for Project Management | Andika Bayu Saputra, S.Kom, M.Kom | 11/16/2026 | 11/18/2026 | 3 | Yogyakarta | 7,950,000 | |
| Project Construction Management | DR. Ir. Syahril, BSCE., M.T., IPU., ASEAN Eng., APEC Eng | 11/16/2026 | 11/18/2026 | 3 | Bandung | 7,950,000 | |
| Power Plant Performance Test | DR. Willy Adriansyah, ST, MM | 11/16/2026 | 11/18/2026 | 3 | Bandung | 7,950,000 | |
| Reliability Instrument & Control | Ir. Deddy Nugraha, CMRP, Dwi Fitrianto, S.T | 11/16/2026 | 11/18/2026 | 3 | Bandung | 7,950,000 | |
| Quality Control Mesin Saat Pemeliharaan dan Overhaul | Ir. Deddy Nugraha, CMRP and Team | 11/16/2026 | 11/18/2026 | 3 | Bandung | 9,500,000 | |
| Contractor Safety Management System | Ir. Heri Setiawan, MK3 | 11/16/2026 | 11/18/2026 | 3 | Bandung | 7,950,000 | |
| Safety Integrity Level (SIL) | Ir. In Jumanda Kasdadi, M.T. | 11/16/2026 | 11/18/2026 | 3 | Bandung | 7,950,000 | |
| Drilling & Completion Well Integrity | Prof. Dr.-Ing. Bonar Tua Halomoan Marbun | 11/16/2026 | 11/19/2026 | 4 | Bandung | 12,950,000 | |
| Flow & Level Custody Measurement | Prof. Endra Joelianto, Ir., Ph.D., SMIEEE | 11/16/2026 | 11/18/2026 | 3 | Bandung | 7,950,000 | |
| Electrical Safety, Theory and Application | Supriyanto, S.T., M.T/ Ali Mashar, M.Eng.Sc., IPU | 11/16/2026 | 11/18/2026 | 3 | Bandung | 7,950,000 | |
| Balance Score Card, Strategy & Implementation | DR. Djadja Achmad Sardjana S.T., M.M. | 11/17/2026 | 11/19/2026 | 3 | Bandung | 7,950,000 | |
| Technical Projects Document Management | Ir. Anita Sampratiwi & Hani Hendarsih S.Hum | 11/17/2026 | 11/19/2026 | 3 | Jakarta | 8,950,000 | |
| Spare Parts Management | Ir. Irfan Zen/ Rusmana, ST., MT | 11/17/2026 | 11/19/2026 | 3 | Bandung | 7,950,000 | |
| Turbo Machinery Operation & Maintenance | I. Parno Rahajo, M.Sc., Ph.D. | 11/18/2026 | 11/20/2026 | 3 | Bandung | 7,950,000 | |
| Transformer Maintenance & Operation | Ir. Nana Heryana, S.T. IPU., ASEAN.Eng | 11/18/2026 | 11/20/2026 | 3 | Bandung | 7,950,000 | |
| Warehousing Operation Management System | Ir. R. Iim Takwim, ST., MM., IPM., ASEAN.Eng., ACPE | 11/18/2026 | 11/20/2026 | 3 | Bandung | 7,950,000 | |
| Budgeting & Cost Control | DR. Achmad Fadjar.,S.E.,M.Si.,Ak.,CA | 11/23/2026 | 11/25/2026 | 3 | Bandung | 7,950,000 | |
| RCM (Reliability Centered Maintenance) | Ir. Deddy Nugraha, CMRP and Team | 11/23/2026 | 11/25/2026 | 3 | Bandung | 9,500,000 | |
| Marginal Field Development | Prof. Dr.-Ing. Bonar Tua Halomoan Marbun | 11/23/2026 | 11/25/2026 | 3 | Bandung | 10,950,000 | |
| Distributed Control System (DCS) Operation & Maintenance | Prof. Endra Joelianto, Ir., Ph.D., SMIEEE | 11/23/2026 | 11/25/2026 | 3 | Bandung | 7,950,000 | |
| Electrical Wiring Diagram & Electrical Control System | Supriyanto, S.T., M.T/ Ali Mashar, M.Eng.Sc., IPU | 11/23/2026 | 11/25/2026 | 3 | Bandung | 7,950,000 | |
| e-Proc Berbasis ICT | DR. Djadja Achmad Sardjana S.T., M.M. | 11/24/2026 | 11/26/2026 | 3 | Bandung | 7,950,000 | |
| Maintenance & Repair Process | Ir. Irfan Zen | 11/24/2026 | 11/26/2026 | 3 | Bandung | 7,950,000 | |
| Basic Petroleum Resources Management System (PRMS) | Ir. Sudiharto, M.T. | 11/24/2026 | 11/26/2026 | 3 | Bandung | 7,950,000 | |
| Hubungan Industrial dan Human Resources Management | DR. Nina Nurani S.H., M.Si, CPHCPM | 11/25/2026 | 11/27/2026 | 3 | Bandung | 7,950,000 | |
| Construction Completion Management System (CCMS) | Ir. Dody Lesmana | 11/25/2026 | 11/27/2026 | 3 | Bandung | 7,950,000 | |
| Process Safety & Asset Integrity Management System | Ir. In Jumanda Kasdadi, M.T. & Ir. Deddy Nugraha, CMRP | 11/25/2026 | 11/27/2026 | 3 | Bandung | 7,950,000 | |
| Big Data & Cloud Computing | Andika Bayu Saputra, S.Kom, M.Kom | 12/1/2026 | 12/2/2026 | 2 | Jakarta | 5,950,000 | |
| BOILER (Pengoperasian Burner System: Coal, Main Oil Gun, Tiny Oil Gun) | Cecep Slamet Abadi, S.T., M.T | 12/1/2026 | 12/3/2026 | 3 | Bandung | 7,950,000 | |
| Analisa & Evaluasi Perencanaan Strategi Pemeliharaan Pembangkit | Maridjo, Drs, S.T., M.T | 12/1/2026 | 12/3/2026 | 3 | Bandung | 7,950,000 | |
| Contract Writing, Planning & Basic Management | DR. Nina Nurani S.H., M.Si, CPHCPM | 12/2/2026 | 12/4/2026 | 3 | Bandung | 7,950,000 | |
| Asset Performance Management | Ir. Deddy Nugraha, CMRP and Team | 12/2/2026 | 12/4/2026 | 3 | Bandung | 7,950,000 | |
| Boiler Control & Burner Management System | Ir. In Jumanda Kasdadi, M.T. | 12/2/2026 | 12/4/2026 | 3 | Bandung | 7,950,000 | |
| O&G Reserves and Resources Evaluation | Prof. Dr.-Ing. Bonar Tua Halomoan Marbun | 12/2/2026 | 12/4/2026 | 3 | Bandung | 10,950,000 | |
| Electrical, Instrument & Control System | Prof. Endra Joelianto, Ir., Ph.D., SMIEEE | 12/3/2026 | 12/5/2026 | 3 | Bandung | 7,950,000 | |
| Compressor Maintenance & Operation | Cecep Slamet Abadi, S.T., M.T | 12/7/2026 | 12/9/2026 | 3 | Bandung | 7,950,000 | |
| Electrical and Mechanical Safety | DR. Toto Tohir, ST., MT/ Martono, ST., MT | 12/7/2026 | 12/9/2026 | 3 | Bandung | 7,950,000 | |
| Failure Mode and Effect Analysis | Ir. Deddy Nugraha, CMRP and Team | 12/7/2026 | 12/9/2026 | 3 | Bandung | 9,500,000 | |
| Coal Dust Explosion | Marhan Saub | 12/7/2026 | 12/8/2026 | 2 | Bandung | 5,950,000 | |
| Gas & Diesel Engines | Maridjo, Drs, S.T., M.T | 12/7/2026 | 12/9/2026 | 3 | Bandung | 7,950,000 | |
| Substitution Equipment & Control Relay | Supriyanto, S.T., M.T | 12/7/2026 | 12/9/2026 | 3 | Bandung | 7,950,000 | |
| Business Prosess & Change Management | DR. Djadja Achmad Sardjana S.T., M.M. | 12/8/2026 | 12/10/2026 | 3 | Bandung | 7,950,000 | |
| Gas Hazard & Measurement | Ir. In Jumanda Kasdadi, M.T. | 12/8/2026 | 12/10/2026 | 3 | Bandung | 7,950,000 | |
| Power Generator Excitation System | Ir. Nana Heryana, S.T. IPU., ASEAN.Eng | 12/8/2026 | 12/10/2026 | 3 | Bandung | 7,950,000 | |
| Onshore Facilities Infrastructure-Design, Constructions & Operation Optimization | Ir. Agus Ibrahim | 12/9/2026 | 12/11/2026 | 3 | Jakarta | 7,950,000 | |
| Manajemen Risiko Sesuai ISO 31000 | Ir. Suharto, MBA | 12/9/2026 | 12/11/2026 | 3 | Bandung | 7,950,000 | |
| Rig and Equipment Selection | Ir. Steve Hartono | 12/9/2026 | 12/10/2026 | 2 | Bandung | 6,950,000 | |
| Flow Assurance for Pipeline System | Prof. Endra Joelianto, Ir., Ph.D., SMIEEE | 12/9/2026 | 12/11/2026 | 3 | Bandung | 7,950,000 | |
| Vibration Analysis | Cecep Slamet Abadi, S.T., M.T | 12/14/2026 | 12/16/2026 | 3 | Bandung | 7,950,000 | |
| P&ID dan Logic Diagram Pembangkit | DR. Toto Tohir, ST., MT/ Martono, ST., MT | 12/14/2026 | 12/16/2026 | 3 | Bandung | 7,950,000 | |
| Life Cycle Cost Management | Ir. Deddy Nugraha, CMRP and Team | 12/14/2026 | 12/16/2026 | 3 | Bandung | 9,500,000 | |
| Operasi Coal Handling PLTU Batubara | Maridjo, Drs, S.T., M.T | 12/14/2026 | 12/16/2026 | 3 | Bandung | 7,950,000 | |
| Oil & Gas Measurement & Metering Custody | Prof. Endra Joelianto, Ir., Ph.D., SMIEEE | 12/14/2026 | 12/16/2026 | 3 | Bandung | 7,950,000 | |
| Pemeliharaan Proteksi Peralatan Elektrikal & Supervisory Pembangkit | Supriyanto, S.T., M.T/ Ali Mashar, M.Eng.Sc., IPU | 12/14/2026 | 12/16/2026 | 3 | Bandung | 7,950,000 | |
| e-Proc Berbasis ICT | DR. Djadja Achmad Sardjana S.T., M.M. | 12/15/2026 | 12/17/2026 | 3 | Bandung | 7,950,000 | |
| Pipeline Corrosion & Scale Integrity Management | Ir. Ifan Rifandi, M.T. | 12/15/2026 | 12/17/2026 | 3 | Bandung | 7,950,000 | |
| Heat Exchanger, Design, Operation & Maintenance | Ir. In Jumanda Kasdadi, M.T. | 12/15/2026 | 12/17/2026 | 3 | Bandung | 7,950,000 | |
| Pemeriksaan & Pengujian Electrical Grounding system | Ir. Nana Heryana, S.T. IPU., ASEAN.Eng | 12/15/2026 | 12/17/2026 | 3 | Bandung | 7,950,000 | |
| Produced Water Management | Ir. In Jumanda Kasdadi, M.T./ Vitus Denny/ Alief Bakhtiar | 12/15/2026 | 12/17/2026 | 3 | Bandung | 7,950,000 | |
| Perencanaan Strategi Pemeliharaan Peralatan Pembangkit | Maridjo, Drs, S.T., M.T | 12/16/2026 | 12/18/2026 | 3 | Bandung | 7,950,000 | |
| Preventive and Predictive Maintenance | Cecep Slamet Abadi, S.T., M.T | 12/21/2026 | 12/23/2026 | 3 | Bandung | 7,950,000 | |
| Pengujian & Kalibrasi Proteksi Peralatan Electrical Pembangkit | Supriyanto, S.T., M.T | 12/21/2026 | 12/23/2026 | 3 | Bandung | 7,950,000 | |
| Maintenance and Reliability Management System (MRMS) | Ir. Deddy Nugraha, CMRP and Team | 12/28/2026 | 12/30/2026 | 3 | Bandung | 9,500,000 | |