• Drilling Problem Analysis

    Bandung Jawa Barat, Indonesia

    Public Training berikutnya : 12 – 14 Oktober, 2026
    Drilling Problem Analysis | drilling problem analysis | drilling-problem-analysis Identify and solve common drilling problems in oil and gas operations. Enhance operational safety and efficiency. | Solve drilling issues in oil and gas. Identify common problems and improve safety and efficiency in your operations. | Prof. Herianto* Ir* M.Sc.* Ph.D | Oil & Gas

  • PSC Business & Profit Sharing Funds

    Jakarta

    PSC Business and Profit Sharing Funds | PSC business profit sharing funds | psc-business-profit-sharing-funds Pelajari skema Profit Sharing Contract (PSC) untuk mendukung manajemen pendapatan di industri minyak dan gas. | Learn about Profit Sharing Contract (PSC) schemes to support revenue management in the oil and gas industry. | Dr. A. Rinto Pudyantoro* MM* Ak* CA | Oil & Gas* Management* Finance

  • PSC Planning and Control (POD, WP&B, and AFE)

    Jakarta

    PSC Planning and Control (POD* WPandB* and AFE) | PSC planning control POD WPB AFE | psc-planning-control-pod-wpb-afe Pelajari perencanaan dan pengendalian PSC untuk optimalisasi proyek migas. | Study PSC planning and control for project optimization in oil and gas. | Dr. A. Rinto Pudyantoro* MM* Ak* CA | Oil & Gas* Finance

  • Oil and Gas Processing Plants

    Bandung Jawa Barat, Indonesia

    Oil and Gas Processing Plants | oil gas processing plants | oil-gas-processing-plants Kuasai pengelolaan fasilitas pemrosesan minyak dan gas untuk hasil yang optimal. | Master oil and gas processing facility management for optimal outcomes. | Ir. In Jumanda Kasdadi* M.T | Process* Production Operation* Engineering

  • Produced Water Management

    Bandung Jawa Barat, Indonesia

    Public Training berikutnya : 15 - 17 Desember, 2026
    Produced water merupakan fluida dengan volume terbesar yang dihasilkan dalam operasi minyak dan gas | Seiring meningkatnya usia lapangan, rasio produced water terhadap hydrocarbon cenderung meningkat dan menimbulkan tantangan teknis, lingkungan, serta biaya operasi yang signifikan | Dengan demikian Produced Water Management menjadi isu teknis, lingkungan, dan ekonomi yang kritikal.

  • Integrated Reservoir Management

    Bandung Jawa Barat, Indonesia

    Integrated Reservoir Management (IRM) is a structured approach to maximize the value of hydrocarbon assets by combining G&G, Reservoir Engineering, Drilling, Completion, Production, and Economic considerations into a single framework | Through effective integration of data and disciplines, operators can improve recovery factors, extend field life, and optimize development plans. This is where “Integrated” play crucial roles | In practice, however, many engineers tend to focus narrowly on their own disciplines. For example, Production and Completion Engineers often prioritize well deliverability without paying sufficient attention to reservoir behavior, while geoscientists may overlook operational constraints | These siloed approaches lead to inefficiencies, missed opportunities, and suboptimal recovery | A proper IRM program helps overcome these bad habits by fostering collaboration, aligning objectives, and ensuring every decision accounts for both well performance and reservoir sustainability.

  • Economics & Commercial Aspects of POD

    Background: Plan of Development (POD) of oil & gas fields represents a very complex problem and involves huge amounts of investments. POD is also one of the main business processes […]

  • Coal Quality & Handling for Power Plant

    Bandung Jawa Barat, Indonesia

    Public Training berikutnya : 3 - 5 November, 2026
    Coal Quality and Handling for Power Plant | Kuasai teknik pengelolaan kualitas batubara untuk meningkatkan efisiensi pembangkit listrik. | Master coal quality management techniques to enhance power plant efficiency. | Slamet Suprapto, M.Sc | Power Generation

  • Basic Drilling & Well Completion

    Bandung Jawa Barat, Indonesia

    Public Training berikutnya : 19 – 21 Oktober, 2026
    Drilling and Well Completion are two critical phases in the lifecycle of an oil and gas well | A successful drilling operation not only ensures the structural integrity of the wellbore but also lays the foundation for effective production and long-term safety | Comprehensive understanding of well design, drilling fluid behavior, equipment selection, and completion strategies is essential to minimize risks and maximize well performance in the long run | Structured to provide a solid technical foundation as well as a practical perspective for professionals involved in drilling & completion operations | The content covers all key stages, including SHE aspects — from well planning and rig setup to casing, cementing, and the installation of wellhead and Christmas tree — ensuring participants gain both theoretical and operational clarity.

  • Rig and Equipment Selection

    Bandung Jawa Barat, Indonesia

    Public Training berikutnya : 9 – 10 Desember, 2026
    Rig and equipment selection is a critical early decision in drilling planning that directly affects safety, operational efficiency, cost, and overall project success | Inappropriate rig selection can lead to operational limitations, excessive non-productive time (NPT), or increased HSE exposure | For example, lack of appropriate knowledge may wrongly select rig rental company during tender evaluation | Designed to provide engineers and supervisors—up to drilling management level—with a structured framework for selecting drilling rigs and major equipment based on well objectives, geological conditions, operational challenges, and economic considerations.

  • POD, WP&B, and AFE

    BACKGROUND: Kegiatan utama dan pertama bisnis hulu migas adalah mencari dan membuktikan keberadaan migas. Apabila cadangan berhasil ditemukan, maka selanjutnya keputusan investasi dan pengembangan akan ditentukan dengan mempertimbangkan hasil perhitungan […]